How does a new aircraft get certified? – Navigation and Technology aviation lesson

Lesson 77 of 90 in the Navigation and Technology course (ages 14+)

UK version. UK spelling and units (hPa, metres, litres) and the UK CAA. · US version

Before a new aircraft can carry passengers, its makers must prove to the national regulator that every part of the design meets strict safety rules. Follow the journey from drawing board to test flights to the factory line.

Time
40 minutes + 10 min homework
Course
Navigation and Technology (ages 14+)
You need
Paper, a pencil and this page
Marked
Instantly, with explanations

Education and interest only. Classfern teaches aviation as a school subject. It is not flight training, not an approved training organisation, and nothing here counts towards a pilot licence or replaces a CAA-approved course and the CAA’s own exams.

How to use this lesson

Sources: UK CAA page on type certificates; FAA 'How it works: aircraft certification' page. A good link to design and technology (specifications and testing) and to science (fair tests). Every answer is marked straight away with a worked explanation.

  1. Read what you will learn and the big ideas.
  2. Press Start the lesson below for the teaching, worked examples and practice (Getting started, On track or Challenge).
  3. Finish with the exit ticket and the talk question: “New aircraft take years to approve. Is it worth the wait? What could go wrong if the process were rushed?”
  4. Later: the homework, then the practice test.

Watch out for

  • Thinking a type certificate approves each aircraft built. It approves the design. The factory and each individual aircraft are checked separately.
  • Thinking certification is just a few test flights. Most of the work is analysis and ground testing, along with many hours of flight testing, over several years.
  • Thinking the rules are the same for a small two-seater and a big airliner. Different sizes and types of aircraft have different sets of standards, and new ideas can need special extra conditions.

Hands-on: Design a paper aeroplane and write your own 'certification basis' – three rules it must meet (for example, it must fly at least 3 m, land without breaking, and fly straight). Plan how you will prove each one, then run the tests five times each and record the results. Did your design 'pass'? What would you change?

What you will learn

  • I can explain what a type certificate is and who issues it.
  • I can describe the main stages a new design goes through, from agreeing the rules to test flying.
  • I can explain the difference between approving a design and approving the factory that builds it.
  • I can explain why the process takes years and why that makes flying safer.

Key words

regulator
The government body that sets and checks safety rules – the UK Civil Aviation Authority (CAA) or the US Federal Aviation Administration (FAA).
type certificate
The regulator's approval of an aircraft design and its parts.
certification basis
The agreed set of safety rules a particular new design must meet.
means of compliance
How the maker will prove each rule is met – by calculation, ground test, flight test or inspection.
production certificate
Approval for a factory to build copies of an approved design, with proper quality control.

The big ideas

Every new aircraft type must be approved by a regulator before it can enter service. In the UK that is the Civil Aviation Authority (CAA). The approval of the design is called a type certificate. The UK CAA explains that the company must first hold a design organisation approval – proof that it is set up to design aircraft safely. Then the company and the CAA agree the certification basis (the rules the design must meet), the means of compliance (how each rule will be shown to be met) and how closely the CAA will be involved.

The makers then prove every rule is met, using calculations, laboratory tests on parts, huge ground tests and many hours of test flying. Wings are bent until they nearly break, and test aircraft are flown to the edges of what they can do, with specially trained test pilots and engineers on board. When the CAA is satisfied, it issues the type certificate along with a data sheet that records the approved design.

Approving the design is not the end. The factory building copies must also be approved, and each individual aircraft must be checked before it flies. This careful, slow process – often taking several years for a new airliner – is one reason flying is so safe.

Read-through: the teaching steps

  1. Who decides?

    Each country has a regulator. In the UK it is the CAA; in the US it is the FAA; in the European Union it is EASA. A design approved in one country is usually checked again (validated) by the others before it can fly there, though agreements between countries make this quicker.

  2. Agree the rules first

    Before building anything, the maker and the regulator agree the certification basis. Most rules come from existing airworthiness standards for that size of aircraft. A brand-new idea, such as a new kind of electric motor, may need special extra conditions written just for that design.

  3. Plan how to prove it

    For every rule, the maker states how it will show the rule is met:

    • calculation or computer analysis
    • laboratory tests of parts and materials
    • full-size ground tests (for example, bending a wing)
    • flight tests
    • inspection of the finished aircraft
  4. Ground tests

    Huge tests happen on the ground. A complete airframe may be bent, twisted and loaded many times over to show it is strong enough and will not crack too soon. Jet engines are tested by firing objects into them and running them in heavy rain and hail. Fire, lightning and cabin evacuation are tested too.

  5. Flight tests

    Several test aircraft fly for many hours. Test pilots check stalls, very slow and very fast flight, flying with one of the jet engines shut down, heavy and light loads, hot and cold weather and wet runways. Every flight records huge amounts of data for the engineers.

  6. Design approval, then the factory

    When the regulator is satisfied, it issues the type certificate. Separately, the factory must show it can build identical copies with good quality control before it is approved to produce them. Each finished aircraft is then checked before its first flight with a customer.

The lesson, step by step

40 minutes in 5 parts
PartTimeHow it is checked
Starter: warm up4 minMarked by Classfern
Teaching and hands-on task12 minNot assessed, self-checked
Worked examples and guided practice8 minMarked by Classfern
Independent practice (three levels)11 minMarked by Classfern
Exit ticket and talk question5 minMarked by Classfern, self-checked

Make my lesson plan Opens this lesson in the free Lesson Plan Maker, filled in and ready to change, print or save.

The lesson

It runs here on the page. No sign-up and no names – progress is kept only in this browser.

Homework

About 10 minutes: 6 questions and a one-line reflection, all marked instantly.

More practice

More Big questions lessons · Navigation and Technology course · All aviation practice tests · Aviation Department

Sources and curriculum

Facts in this lesson were checked against:

Our lessons and questions are our own. They are not written or endorsed by the CAA, any flying school, testing agency or exam board.